Quick wins: why the innovation queue ships only easy work

The innovation queue ships only easy work because the priority list says what matters, but the person holding the queue decides what moves. Under load, that person picks the short item or the one with a deadline. The list of deliveries grows and the large project sits still. The fix is in how the queue is designed.
Why does a loaded team pick the easy item?
Because finishing something relieves pressure, and the easy item is the one you can finish today. Diwas KC, Bradley Staats, Maryam Kouchaki and Francesca Gino studied that choice in the emergency department of a US hospital, where physicians pick up patients from a virtual queue after triage. The paper, published in Management Science in 2020, uses six years of data and names the behavior: task completion preference.
The result has two halves. As workload rises, the physician tends to choose the simpler patient, and that choice appears to improve the volume handled in the shift. When the authors adjust volume for case complexity, the preference for easy work is tied to worse throughput. They also report less learning: physicians who take more simple cases improve their own service time less.
For a sense of scale, the published field study covers fiscal years 2005 to 2010, with more than 233,000 patient encounters treated by 84 providers. A note on the source: the paper also includes a lab experiment, which we leave out. Three co-authors stated publicly that they never had access to the raw data for that experiment, and that the author responsible for it took no part in collecting or analyzing the field study data. The field study is the only part we use here.
Does choosing your own order cost anything?
It does, even for experienced professionals. Maria Ibanez, Jonathan Clark, Robert Huckman and Bradley Staats analyzed 2.4 million radiological diagnoses. Exams reached each doctor's queue by random assignment, which let the authors isolate the effect of choice. Doctors prioritized exams that resembled each other and exams they expected to finish faster.
Those deviations reduced productivity, and prioritizing the shortest exam was particularly harmful. The loss shrank as doctors gained experience. One detail is useful for anyone designing a process: when similar exams arrived already grouped, productivity went up. When the doctor stopped to group them, it went down. The authors conclude that the cost of deviating outweighs the benefit of repetition.
The reading for management is ours, and it has a limit: these are doctors, not innovation teams. The mechanism is familiar, though. Scanning the queue for what can be closed quickly takes time and pushes to the back the very item that demands the most.
And the urgent item: why does it jump ahead of the important one?
Because the deadline draws more attention than the payoff. In 2018, Meng Zhu, Yang Yang and Christopher Hsee published five experiments in the Journal of Consumer Research on what they called the mere urgency effect. According to the summary released by Johns Hopkins, participants chose the task with a short completion window even when the other task offered a larger payoff.
Two findings matter to anyone running a portfolio. The effect was stronger in people who perceived themselves as busy. And it weakened when the payoff of each task was brought back to mind at the moment of choice.
Now put the three studies together. An innovation team usually works under load. The small request from the head of sales arrives with a deadline. The structural project has no date and nobody chasing it. No prioritization matrix changes that scene, because the matrix is consulted in the committee and the choice happens on Monday morning.
How do you design the queue so the large project moves?
Take the choice out of the moment of pressure. There are four decisions, and all of them are design decisions.
The first is reserved capacity. The large initiative needs people and days that do not compete with small requests. If it only moves on what is left over, it does not move, because an always-full team has nothing left over. Small requests go into a second queue, with a cap.
The second is an order set in advance. The radiology study suggests the gain comes from receiving the queue already grouped. Set the sequence in the weekly ritual and have the system hand out the next item, instead of showing each person the whole list to choose from.
The third is value next to the deadline. If the screen shows only the due date, urgency decides alone. Show the expected return and the cost of each month of delay beside it. The criterion behind that number has to be the same for everyone, which is the subject of the article on why two people score the same initiative differently.
The fourth is counting delivery by weight. A report that adds up completed items repeats what the emergency department saw before the adjustment: more volume. Classify each initiative by size when it enters the inventory and report progress on the large ones on a separate line.
There is a fifth measure, which is our recommendation and does not come from the studies: slice the large initiative into stages that go into use on their own. That way the hard work also produces completions, and the team does not need to look for them in small requests.
A practical example, and it is a hypothesis
The scenario below is illustrative. The numbers were chosen to show the reasoning and do not come from any measurement.
A logistics operator in Louisville, Kentucky, with 400 employees, has an innovation team of four. In the third quarter, the report to the leadership team lists 14 deliveries: a new form, three reports, tweaks to a dashboard, email automations. The integration between the routing system and billing, first on the priority list since March and estimated at ten weeks of work, advanced the equivalent of two.
Nobody disobeyed the priority. Each small request had a director waiting and fit into an afternoon. The innovation manager redraws the design for the following quarter: two of the four people work only on the integration, small requests go into a queue capped at six a month, and the integration is split into three stages, each with its own use.
At the end of the fourth quarter, the report lists seven small deliveries, two stages of the integration in use and the third in acceptance testing. The count of small deliveries fell by half. The conversation with leadership needs a new column in the report to explain why that is better, and that is the real cost of the change.
Frequently asked questions
How do I justify a quarter with fewer deliveries to leadership?
Change the unit before you change the queue. Present deliveries on two lines, small and structural, and show how many months the first priority has been standing still. With that number on the table, the conversation becomes about what the small items were costing.
What if the team resists losing the freedom to choose what to work on?
The choice still exists, it just moves: out of Monday morning and into the ritual where the sequence is set, with the team in the room. In the radiology study, receiving similar exams already grouped raised productivity. The people doing the work get a queue that does not have to be renegotiated every day.
What about requests that really are urgent?
They go into the small-request queue, which exists for that and has its own capacity. The cap makes whoever is asking choose which urgency gets in this month. If the cap is blown every month, the problem is capacity, and it shows up as a number instead of disappearing inside the large project.
Next step
If your first priority has been standing still for months while the list of deliveries grows, the Operational Architecture Diagnostic is a 30-minute conversation to look at the design of the queue before touching the priority list.