Pilot results: why they shrink when you scale

Marlon TrettinPublished on 8 min read
Silhouette of a man seen from behind at a glass window at night, between a wind tunnel with an amber-lit car on the platform and a rainy avenue jammed with headlights outside

Pilot results shrink at scale because a pilot measures two things at once: the idea and the conditions it ran under. A hand-picked team, an attentive sponsor, data fixed by hand and the best-presented project in the queue. At rollout, only the idea travels. To forecast the scaled result, write those conditions down and measure without them.

Why is the pilot number bigger than the rollout number?

Because the pilot runs under conditions the rollout does not have, and the final number does not separate one from the other. Omar Al-Ubaydli, John List and Dana Suskind, in a 2019 NBER paper, group the causes into three bins: statistical inference (the positive result that was luck), representativeness of the population (who took part is not who will use it) and representativeness of the situation (how the test was run is not how the operation will run it).

In our reading, the third bin weighs most inside a company. The paper cites, for example, California's statewide move to smaller class sizes, which showed diseconomies of scale in implementation costs. The idea was the same as in the small test. The situation was not.

What happens to the result when nobody picks what to show?

It falls, sometimes a lot. Stefano DellaVigna and Elizabeth Linos compared two bodies of evidence in the working-paper version of their study, published by NBER in 2020. The first gathers 26 studies published in academic journals, with 74 interventions and 505,337 participants: on average, the intervention raised take-up by 8.7 percentage points, 33.5% over the control group. The second gathers every trial from two teams that work with US public agencies, the Office of Evaluation Sciences and the Behavioral Insights Team North America: 126 trials, 243 interventions, more than 23 million participants. There the average effect was 1.4 points, 8.1% over control.

According to the authors, the involvement of academics does not appear to explain the gap. What they estimate is that a study without a significant result gets written up and published with a probability of about 0.1. Correcting for that selection, the average effect in the academic sample falls to 3.2 points. Features of the interventions, such as in-person contact instead of a letter, explain another part.

The second sample is useful for a simple reason: both teams record every trial, including the ones that did not work. The application to management is ours. An innovation portfolio that only shows the board the pilots that worked repeats the journals' filter, and the average number that reaches the boardroom is the selected number.

Which pilot conditions do not travel to the rollout?

The ones that depended on people and on unusual effort. In a January 2026 Becker Friedman Institute paper, List describes the typical early childhood pilot: master's-level teachers, four children per adult and intensive oversight from researchers committed to the program's success. At scale, he writes, ratios rise to budget-constrained levels, often eight to one or higher. The same paper notes that pilots benefit from resources below market price, such as donated space and graduate-student labor, which disappear at scale.

In an operation, the list usually includes:

  • the chosen site, which is almost always the most organized one or the one with the most interested manager;
  • the analyst who follows the pilot every day and unblocks whatever gets stuck;
  • data corrected by hand before it enters the flow;
  • the exception handled on the side, in a chat group or a parallel spreadsheet;
  • the sponsor's attention, which makes the team put the pilot ahead of the rest of the work.

None of these items shows up in the final report. All of them show up in the result.

How do you measure a pilot to forecast the scaled result?

Measure the conditions along with the effect. List sums up the proposal in one line of the same paper: evidence about scalability should be generated alongside the efficacy test, not after it. In practice, that asks for three changes in how the pilot is designed.

The first is a conditions sheet, written before you start. For each item on the list above, note how it will look in the pilot and how it will look at rollout. Where the two columns diverge, you already know where the number will fall.

The second is to record manual intervention inside the system itself. Every time someone fixes a record, pushes a stuck order or resolves an exception on the side, it becomes an entry with a date, a type and the time spent. This is an architecture decision, not a spreadsheet one: if the fix leaves no trace, the pilot result reaches the board without the effort that produced it. It connects with how many cases your pilot must see, because the exception resolved by hand is exactly the case the design does not cover yet.

The third is to run at least one round under rollout conditions: at the median site, with the team that will operate it and without the dedicated analyst. If there is a site waiting its turn, the comparison gets cleaner, as discussed in before and after is not enough.

A practical example, and it is a hypothesis

The scenario below is illustrative. The numbers were chosen to show the reasoning and do not come from any measurement.

An auto parts distributor with five distribution centers tests a new order-checking rule at its Columbus DC, the one with the strongest supervisor. For three weeks, an IT analyst follows the operation and fixes the product catalog every morning. Picking errors fall from 2.1% to 0.7%, and the project reaches the board with the promise of cutting two thirds of errors across all five DCs.

The innovation manager builds the conditions sheet before the rollout and finds three gaps: the analyst will not exist at the other DCs, the other catalogs have more items without a valid barcode, and the Columbus supervisor is the only one who asked for the project. She runs a second round at the Indianapolis DC, without the analyst, with every manual fix recorded in the system. Errors fall to 1.4%, with an average of 22 manual fixes per day.

The project is still good. The promise changed: cut about a third of errors, plus a catalog validation module that turns the 22 daily fixes into a system rule. That second number is one the board can hold the team to.

What should you bring to the board instead of a single number?

A range and the list of what supports it. List estimates, citing his own 2022 work, that between 50% and 90% of results lose voltage at scale. It is a broad estimate across fields, not a rate for your project. It serves to calibrate the expectations of whoever approves: the pilot result is the ceiling, not the forecast.

Bring three numbers: the effect in the pilot, the effect in the round under rollout conditions, and the cost of building into the system what the pilot did by hand. If the third one does not add up, the project is still a prototype. What it still needs to become part of the operation is covered in prototype approved: what makes it a system.

Frequently asked questions

Can I measure the result without a comparison group?

Start with the conditions sheet and the manual intervention log, which need no comparison group. They already show how much of the result depended on extra effort. If a site joins the rollout later, use it as the comparison.

Will the implementation take too much of my team's time?

The extra round under real conditions adds weeks to the schedule. The cost of skipping it shows up later, when the rollout delivers less than promised and that gap starts to weigh on how the next project is judged. The intervention log, when it is part of the system, adds little to the routine: the date, type and time of each fix, recorded in the same flow where it happens.

What if the scaled result is too small to justify the investment?

Then you found that out before investing in the rollout, which is what the pilot is for. A smaller effect can still pay off, as long as the math is done with it. When it does not, closing on evidence protects the budget for the next project.

Next step

If your pilot is about to become a rollout and nobody wrote down the conditions it ran under, the Operational Architecture Diagnostic is a 30-minute conversation to separate the effect of the idea from the effort of the team before the decision.

Related case studies

Marlon Trettin

Marlon Trettin

Founder of Yowpi · 25+ years of software engineering

LinkedIn
Next step

Did you recognize your operation in this article?

Book the Operational Architecture Diagnostic: 30 minutes to map where your operation's bottleneck is. No proposal in the first conversation.

Book a diagnostic